2015 Projects

Froesel Drive
Proposed improvements will include removal and replacement of the existing street with a 26-foot wide asphaltic concrete street with concrete curbs and gutters, modifications and expansion to the existing stormwater system including best management practices such as bioretention areas, removal and replacement of driveway approaches and other miscellaneous items such as grading and sodding.

The engineering consultant is currently preparing the preliminary engineering drawings.